THE WATER EXPERTS BEHIND INFRASTRUCTURE
Due to the scale and often lengthy timelines for the completion of many of these projects, it critical that water related equipment and systems can be co-ordinated and reliably delivered across the life of the project, that’s where we come in.
Protex Water are experts when it comes to these types of projects, offering outstanding stormwater management and water treatment solutions, as well as all the necessary water storage, water pumping and fire services required to make your project a success. And because we offer a full set of water solutions you only need to have one water services provider for you project, making inter-connectivity a breeze and improving system reliability.
We also offer state-of-the-art pump hire through our sister company Pinnacle Hire, for sites while under construction, helping you manage groundwater, stormwater and sewerage challenges along the way.
With many major projects completed over the last decade, we can confidentially say we are a highly experienced and professional provider who understand the critical nature of the industry, so we won’t let you down. Our popular product used across infrastructure projects include our Elementz water treatment plants, Clearmaster pump stations, along with our Fortress tanks and Torpedo below ground storage tank systems.
World-class water systems manufactured right here in Australia and designed for local conditions.
OUR KEY INDUSTRY SPECIFIC BRANDS
- Elementz – Water treatment and sewage plants
- Clearmaster – Advanced pump stations & wash bays
- Fortress – Above ground tanks
- Torpedo – Below ground tanks
POPULAR BRANDS
-
- Screening, separators, conveyors, DAF systems and clarifiersScreening, separators, conveyors, DAF systems and clarifiers
-
-
PROJECT PROFILES
10 Nov: Rainwater Reuse Plant For Major Logistics Hub
Protex Water was contracted to deliver a Elementz Rainwater Reuse Filtration Plant for a new Mainfreight warehousing and freight facility in Dandenong South, Melbourne….
03 Nov: Bleedwater Treatment Plant For Melbourne CBD Tower
Situated at the heart of Melbourne’s CBD, the impressive 555 Collins is nearing completion. Protex Water has just supplied an Elementz Bleedwater Treatment Plant to the development…
22 Aug: Groundwater Treatment For Carbon Conscious Victoria Place
Advanced building boosts a specially designed Elementz Groundwater Water Treatment Plant…
22 Jun: Hydrocarbon Removal Plant For Hire Business Operator
Pinnacle called upon Protex Water to provide an innovative water treatment solution to manage hydrocarbon contaminated water…
14 Jun: Multi-faceted Green Star Solution
Protex Water delivers a multi-faceted water treatment solution, providing high levels of Green Star rating and innovative design, to the much-heralded Carlton Connect project…
22 Apr: Helping To Recycle Smarter
We were recently engaged to design and install a plumbing installation for the new bulk chemical storage facility at Visy’s Campbellfield plant…
14 Nov: Rising to the groundwater challenge
Dealing with groundwater seepage into basements, particularly for major construction projects with multi-level basements and high water tables, can be challenging…
30 Sep: Twin Torpedo Tanks for Luxury Apartments
17 Spring Street is a 33 level, luxury apartment development, Protex Water have provided two 19,000 litre below ground Torpedo Tanks for this onsite detention….
24 Sep: Water Security at Victoria Police HQ
Protex Water was the chosen partner to provide a range of water treatment and management systems for the new high-tech Victoria Police HQ in Melbourne’s CBD…
27 Aug: Premier Treatment For Premier Towers
Premier Tower at the heart of Melbourne CBD now ranks in the city’s top 10 tallest buildings and includes one of advanced Elementz Groundwater plants…
30 Apr: Groundwater Treatment Plant For Lakeside Apartments
We were asked to design, manufacture, install and commission a groundwater treatment package for a new apartment complex in Melbourne…
30 Mar: SBR Sewage Treatment Plant for WA Mining Village
Protex Water designed, constructed onsite and commissioned a new treatment package for the Fleetwood Village STP in Karratha WA…