We were asked to design, manufacture and commission a water treatment plant for the processing of Kava Drink in Vanuatu. Designed in two air-conditioned 40′ containers providing a flow rate of up to 250 kL/day…
Protex Water was engaged to design a temporary rental solution to treat surface water at an important Glencore site. The system was designed to comply with stormwater discharge requirements, treating the water to a standard suitable for discharge into the environment…
We’ve designed and manufactured a bespoke Water Treatment Plant for Fletcher International’s major processing facility based in Dubbo, New South Wales.
The system is designed to treat up to 4.3 Ml/day…
We’ve designed and manufactured a new cutting-edge potable water treatment plant in collaboration with Rio Tinto and Worley. Treating bore water, and with a design flow rate of 35 kL/Day, this plant is fully self-monitoring and built to stringent quality and mining specifications…