We were engaged to design, supply, install and commission a new 370 m³/h wastewater treatment package for Baiada’s Oakburn facility in Tamworth, NSW…
Protex Water was commissioned to upgrade the wastewater system at Burra Foods Korumburra processing facility. The new treatment plant features an impressive 1.8 megalitre fibreglass reinforced tank, and utilises an internally mounted grid aeration diffuser system…
While planning for an all-new wastewater Treatment Plant for an international dairy company, due for completion in 2025, we installed a large DAF system at one for their processing plants as an interim measure…
Protex Water was contracted to design, supply, install and commission a waste decontamination system in accordance with the latest 7.10 requirements…
We’ve designed and manufactured a bespoke Water Treatment Plant for Fletcher International’s major processing facility based in Dubbo, New South Wales.
The system is designed to treat up to 4.3 Ml/day…
Protex Water designed and built a large sequencing batch reactor to manage the vast amount of animal excrement generated at CVLX…

