Related Posts
We were contacted to evaluate if it was possible to design, manufacture, install and commission a new sewage treatment plant for Charlotte Pass Ski Resort within a very short 6-week window…
Protex Water was contracted to replace ageing drinking water treatment infrastructure at a BHP Mitsubishi Alliance (BMA) mine in Queensland…
Dealing with groundwater seepage into basements, particularly for major construction projects with multi-level basements and high water tables, can be challenging…
Protex Water designed and built a large sequencing batch reactor to manage the vast amount of animal excrement generated at CVLX…
Protex Water delivers a multi-faceted water treatment solution, providing high levels of Green Star rating and innovative design, to the much-heralded Carlton Connect project…
Cleverly designed across two 40ft containers, the system operates a twin treatment train delivering a combined throughput of 100kL/day, and featuring a modified Bardenpho biological process…
We designed, supplied, installed and commissioned a ChemSphere Effluent Decontamination System (EDS) for Westmead Hospital. Built to achieve AS2243 PC2 Large Facility and OGTR PC2 Large Facility requirements…
Protex Water recently manufactured, and has just commissioned an advanced pharmaceutical water treatment plant…
To facilitate the provision of quality drinking water to several remote communities in South Australia, Protex Water was asked to provide a unique treatment system…
We were asked to design two treatment plants to remove Total Nitrogen from tunnelling wastewater on the Snowy Hydro 2.0 site within the Kosciuszko National Park in the Snowy Mountains…
We’ve designed and manufactured a new cutting-edge potable water treatment plant in collaboration with Rio Tinto and Worley. Treating bore water, and with a design flow rate of 35 kL/Day, this plant is fully self-monitoring and built to stringent quality and mining specifications…
Protex Water was engaged to design and build a compact Rainwater Reuse Filtration Plant for Mainfreight’s logistics facility at Melbourne Airport…
As part of the new Train Manufacturing Facility in Torbanlea, Protex Water worked closely with Axis Plumbing and John Holland to design, manufacture, and commission a new Sewage Treatment Plant (STP) with a flow rate of 35kL/day…
Protex Water was contracted to provide a comprehensive upgrade to the Victoria Golf Course Irrigation System and maintain it into the future…
Protex Water was engaged to design, manufacture and install a Sewage Treatment Plant for Moore Park Beach Holiday Park, north of Bundaberg in Queensland…