Related Posts
Situated at the heart of Melbourne’s CBD, the impressive 555 Collins is nearing completion. Protex Water has just supplied an Elementz Bleedwater Treatment Plant to the development…
We were contracted to upgrade an existing STP including replacing fibreglass bioreactor tanks with new epoxy coated steel tanks…
We were asked to design two treatment plants to remove Total Nitrogen from tunnelling wastewater on the Snowy Hydro 2.0 site within the Kosciuszko National Park in the Snowy Mountains…
We were contacted to evaluate if it was possible to design, manufacture, install and commission a new sewage treatment plant for Charlotte Pass Ski Resort within 31 days…
Pinnacle called upon Protex Water to provide an innovative water treatment solution to manage hydrocarbon contaminated water…
Protex Water designed and built a large sequencing batch reactor to manage the vast amount of animal excrement generated at CVLX…
Our recently completed Elementz DM Plant is neatly packaged in an air conditioned 20ft container, producing permeate water with only 5 µs/cm conductivity and with no TDS…
We designed, supplied, installed and commissioned a ChemSphere Effluent Decontamination System (EDS) for Westmead Hospital. Built to achieve AS2243 PC2 Large Facility and OGTR PC2 Large Facility requirements…
We were asked to design, manufacture and commission a water treatment plant for the processing of Kava Drink in Vanuatu. Designed in two air-conditioned 40′ containers providing a flow rate of up to 250 kL/day…
Protex Water provided an Elementz potable water treatment plant designed to provide 3L/sec of treated water, sufficient for this new prison facility…
Recycling Class B from an existing WWTP, this new plant treats up to 2.6ML per day of effluent to Class A, for irrigation use on a new nearby golf course, and to supply irrigation water to farmers in the area…
Protex Water were contracted to design, manufacture, install and commission a complete aeration package for the new Bodalla Plant…
With a growing clientele and with a desire to safe guard the pristine environment, Mt Buller Resort needed to upgrade its sewage facilities.
Protex Water was engaged to design a temporary rental solution to treat surface water at an important Glencore site. The system was designed to comply with stormwater discharge requirements, treating the water to a standard suitable for discharge into the environment…
Protex Water was contracted to provide a new drinking water treatment plant at the Kenmare Mine in Queensland…