We’ve designed, manufactured, and installed a new Sewage Treatment Plant (STP) for Anglo American’s Aquila Mine site in Queensland. With a design flow rate of 100 kL/Day, the plant is fully self-monitoring, tracking DO, TSS, NTU, pH, and Free Chlorine (FCL), through different stages of the treatment train.
Utilising our advanced Elementz technology, the plant is built across three 40ft shipping containers, incorporating a Pre-Anoxic, Anoxic Zone, Aeration, Lamella Clarifier, and AFM Polishing Filter, followed by a Sodium Hypo Chlorite disinfection system. The treated effluent is discharged to a specifically designed solar powered irrigation system covering a 750m x 160m area.
In addition, we supplied raw sewage and effluent storage poly tanks, along with underground pump stations.
Designed to meet Anglo American Mine specifications, both mechanical and electrical, this fully packaged plant was built at our Victorian based manufacturing facility and fully FAT tested prior to site delivery, installation, and commissioning.