We were asked to design two treatment plants to remove Total Nitrogen from tunnelling wastewater on the Snowy Hydro 2.0 site within the Kosciuszko National Park in the Snowy Mountains…
We’ve recently replaced an aging multimedia sand filter / BAC filter system with a new MMF potable water treatment plant, processing approximately 200kL per day for the Goomeri township in Queensland…
We’ve supplied 4 water treatment plants for Pinnacle Hire, neatly packaged within 20ft containers. Using a core of Multimedia Filtration (MMF) the plants were specifically designed to treat site run off water during rain events, including the removal of iron and heavy metals…
Making use of solar power and fully packaged in a 40ft containers, utilises a MLE Biological process, this system delivers a combined throughput of 40kL/day…
Cleverly designed across two 40ft containers, the system operates a twin treatment train delivering a combined throughput of 100kL/day, and featuring a modified Bardenpho biological process…
Packaged in two 40ft containers, this Elementz MemPak Sewage Treatment system manages a flow of up-to 100kL/day…
We recently completed a containerised washbay system for Kalari logistics Coober Pedy depot, ensuring their fleet remained suitably clean…
This Class A plant was designed for a Northern Territory correctional facility to manage sewage for the combined population of prisoners and staff…
We’ve installed an Elementz MemPAK containerised sewage treatment plant to a Queensland customer…
Possibly the largest single piece underground tank ever produced in Australia, transporting it proved a logistical challenge for the team at Protex Water…