We were contacted to evaluate if it was possible to design, manufacture, install and commission a new sewage treatment plant for Charlotte Pass Ski Resort within a very short 6-week window…
Recycling Class B from from an existing WWTP, this new plant treats up to 2.6ML per day of effluent to Class A, for irrigation use on a new nearby golf course, and to supply irrigation water to farmers in the area…
Cleverly designed across two 40ft containers, the system operates a twin treatment train delivering a combined throughput of 100kL/day, and featuring a modified Bardenpho biological process…
Protex Water recently installed an all new irrigation and filtration system at the renowned and picturesque Flinders Golf Course. This has provided a dramatic improvement in water management capability and irrigation control for the Golf Course.
Protex Water was commissioned to design, manufacture, and commission a Class A treatment system, providing a daily flow rate of up to 50kL/day…
With a growing clientele and with a desire to safe guard the pristine environment, Mt Buller Resort needed to upgrade its sewage facilities.
Situated off the tip of Northern Queensland, the beautiful Islands of Badu and Erub have new quality drinking water supplies…
Protex Water installed a comprehensive stormwater management system that can harvest and treat the stormwater, then store and distribute it across the entire site…
Protex Water was contracted to provide a comprehensive upgrade to the Victoria Golf Course Irrigation System and maintain it into the future…