Protex Water was engaged to design a temporary rental solution to treat surface water at an important Glencore site. The system was designed to comply with stormwater discharge requirements, treating the water to a standard suitable for discharge into the environment…
We’ve designed and manufactured a bespoke Water Treatment Plant for Fletcher International’s major processing facility based in Dubbo, New South Wales.
The system is designed to treat up to 4.3 Ml/day…
We designed, supplied, installed and commissioned a ChemSphere Effluent Decontamination System (EDS) for Westmead Hospital. Built to achieve AS2243 PC2 Large Facility and OGTR PC2 Large Facility requirements…
Protex Water was engaged to design, manufacture and install a Sewage Treatment Plant for Moore Park Beach Holiday Park, north of Bundaberg in Queensland…
Built on a rugged yet compact skid, this Clearmaster Wash Bay treatment system contains a 4-stage treatment train and includes an integrated control panel for automatic operation…
We designed and manufactured a large Rainwater/Potable Treatment Plant for the new $1.5 billion Footscray Hospital in Victoria’s western suburbs. The new hospital spans five buildings, employs over 5000 people…
We were contacted to evaluate if it was possible to design, manufacture, install and commission a new sewage treatment plant for Charlotte Pass Ski Resort within a very short 6-week window…
We were asked to design two treatment plants to remove Total Nitrogen from tunnelling wastewater on the Snowy Hydro 2.0 site within the Kosciuszko National Park in the Snowy Mountains…
We’ve recently replaced an aging multimedia sand filter / BAC filter system with a new MMF potable water treatment plant, processing approximately 200kL per day for the Goomeri township in Queensland…
Recycling Class B from an existing WWTP, this new plant treats up to 2.6ML per day of effluent to Class A, for irrigation use on a new nearby golf course, and to supply irrigation water to farmers in the area…