Scroll Top

SEWAGE Treatment Plant

Class A, Containerised Sewage Treatment Plant For Woodside

AKS were contracted to design and manufacture a Class A sewage treatment plant for the Woodside Pluto B site in Karratha, WA.

The Elementz treatment plant uses a MLE process and is designed to treat 68 kL/d of raw sewage and a turndown to 7 kL/d. Strict effluent standards are achieved using two flat sheet submerged membranes.

High quality equipment was is installed throughout, with all motors equipment installed duty/ standby, controlled by an Allen & Bradley RSLogix5000 PLC.

The plant boosts a user-friendly Control Panel with colour HMI touch screen interface, providing data and fault logging, and installed with remote monitoring allowing offsite control.

Manufactured at our state-of-the-art facility, all Elementz systems are fully factory tested prior to dispatch. This helps reduce onsite installation and commissioning time, getting your new plant up and running as quickly as possible.

Related Posts

This will close in 0 seconds

This will close in 0 seconds

This will close in 0 seconds